Cutover runbook builder
A runbook skeleton with rollback points marked and the go/no-go placed where rollback still fits in the window.
A runbook skeleton with the rollback points marked. Durations are left blank on purpose — nobody can tell you how long your steps take except a rehearsal.
- Window
- 8h
- Rollback budget
- 2h
- Go / no-go
- T plus 6h
- Steps
- 24
- Rollback duration has not been measured, so the budget above is a guess at 30% of the window. Rehearse and time it — the figure is usually longer than people expect.
- Partner verification is inside the window but partner remediation is not. If a partner fails verification, the decision is to roll back or run split routing — decide which, in advance.
Everything that can be done before the window, done before the window.
- P-01Freeze changes on both platformsChange manager
Agreed change freeze on legacy and target, with a named approver for exceptions.
- P-02Confirm rollback has been rehearsed and timedTechnical lead
A rollback that has not been executed in a non-production cutover is an assumption. Record the measured duration.
- P-03Verify certificates and keys do not expire in the windowSecurity
Include partner certificates. Renew anything expiring within three months.
- P-04Confirm environment parityPlatform
Target configuration matches what was tested, including endpoints, credentials and scheduler entries.
- P-05Agree go/no-go criteria in writingProgramme
What specifically must be true to proceed, and who decides. Vague criteria become an argument at 2am.
- P-06Confirm every partner is re-certified and readyPartner manager
Written confirmation per partner, including that their allow-lists point at the new egress addresses.
- P-07Book the people, not just the windowProgramme
Named individuals on call for each source and target system, with a contact route that has been tested.
Confirm nothing has changed since preparation.
- F-08Re-run smoke tests on the targetTest lead
Same tests that passed in the last rehearsal, against the current configuration.
- F-09Confirm backup and restore pointPlatform
Legacy platform state captured and verified as restorable, not merely taken.
- F-10Confirm business stakeholders are availableProgramme
Whoever accepts the outcome must be reachable during the window, not the following Monday.
- F-11Go / no-go: proceed to windowdecisionProgramme
First decision point. Cheap to stop here.
Execute, with a rollback point before every irreversible step.
- C-12Quiesce the legacy platformrollback pointPlatform
Stop schedulers and inbound listeners. Let in-flight messages drain and record the count.
- C-13Confirm zero in-flight messagesTechnical lead
Queues, staging tables and file landing zones empty. This is the point where a partial state becomes recoverable.
- C-14Capture reconciliation baselinerollback pointTechnical lead
Record counts and control totals from the legacy platform for comparison after cutover.
- C-15Switch routing to the target platformPlatform
Redirect 18 interfaces. Sequence by dependency, not alphabetically.
- C-16Confirm partner connectivity on the new endpointsrollback pointPartner manager
One transaction per partner, acknowledged both ways. Not a ping — a real message.
- C-17Run verification transactions end to endTest lead
One per interface tier, traced from source through to the system of record.
- C-18Go / no-go: commit or roll back (by T plus 6h)decisionrollback pointProgramme
The last point at which rollback still fits in the window. After this the only route is forward. Budget 2h for rollback.
- C-19Enable schedulers and inbound listeners on the targetPlatform
Bring traffic up in tiers, highest criticality last so problems surface on lower-risk traffic first.
- C-20Reconcile against the baselineTechnical lead
Compare counts and control totals. A discrepancy here is easier to explain now than at month end.
Prove it holds under real conditions before anyone declares success.
- S-21Elevated monitoring and daily reconciliationRun team
Daily comparison of volumes against the equivalent period before cutover.
- S-22Keep the legacy platform recoverablePlatform
Do not decommission, do not reuse the infrastructure, do not let licences lapse.
- S-23First month-end or peak processedBusiness
The real test. Most latent defects surface on a period boundary rather than on day two.
- S-24Formal acceptance and handover to rundecisionProgramme
Against evidence, not against a date in the plan.
The structure is the easy part. The judgement is where the go/no-go sits, what evidence is enough to pass it, and whether a partner failing verification means rollback or split routing — all of which depend on the estate. The risk register covers what typically goes wrong around it.
Durations are left blank deliberately. A runbook with invented timings is worse than one with gaps, because people plan against the numbers instead of measuring them. The one thing asserted here is that the go/no-go must sit where rollback still fits in the remaining window — without that, it is a one-way door with a checklist attached.
Other tools
- EDI viewer & validator (X12 + EDIFACT)
- X.509 certificate decoder
- JSON ↔ XML converter
- CSV ↔ JSON converter
- OpenAPI linter
- MCP tool-definition linter
- OpenAPI → agent tools
- Agent blast-radius calculator
- Prompt secret scanner
- Agent cost & context calculator
- Agent-readiness scorecard
- iPaaS readiness assessment
- Modernisation roadmap generator
- Migration risk register
- Interface catalogue builder
- Migration wave planner
- Function Point estimator
- Platform migration assessor
- Fixed-width flat file parser
- webMethods flow reader
- SAP IDoc viewer
- SWIFT MT & ISO 20022 viewer
- HL7 v2 message viewer
- XSLT tester
- XPath tester
- CI/CD workflow security linter
- Regex tester & ReDoS checker
- Webhook signature verifier
- SLA & error budget calculator
- Retry & backoff simulator
- JSONPath tester
- JSON Schema generator
- Encoding & mojibake fixer
- JSON formatter & validator
- JSON diff
- Epoch & timestamp converter
- Base64 encoder & decoder
- UUID & ULID generator
- JWT decoder
- Cron expression explainer
- Interface math calculator
- Post-quantum migration matrix
- Post-quantum exposure calculator
These exist because the underlying problem is real. If the numbers you just put in look uncomfortable, that is usually worth a conversation.