Migration wave planner
Sequence an interface catalogue into delivery waves — pilot on the safe work, take the hard and critical work early, and start partner conversations first.
Paste the CSV from the catalogue builder and this sequences it into delivery waves. The sequencing rules are opinions from delivery experience, not arithmetic — so each one is stated rather than applied quietly.
- Interfaces
- 8
- Waves
- 2
- Build effort
- 41d
- Capacity per wave
- 56d
- Elapsed
- 8 weeks
Prove the platform, the build pipeline and the deployment path on work that can be wrong without consequence.
- Nightly GL postingTier 2 · simple · 1.5d
Low criticality, no external party — safe place to prove the platform and the pipeline.
- Employee master syncTier 3 · simple · 1.5dno owner
Low criticality, no external party — safe place to prove the platform and the pipeline.
- Price list refreshTier 3 · simple · 1.5d
Low criticality, no external party — safe place to prove the platform and the pipeline.
Tier 1 and complex work, taken while contingency and attention still exist. Going last is how these overrun.
- Order intake from partner EDITier 1 · complex · 12dpartner-facingno owner
Highest impact and highest risk — needs the contingency that only exists early.
- Invoice out to partnerTier 1 · complex · 12dpartner-facing
Highest impact and highest risk — needs the contingency that only exists early.
- Stock levels to webshopTier 1 · medium · 4d
Tier 1 — business-critical, so scheduled ahead of the bulk.
- Product master to PIMTier 2 · medium · 4d
Bulk delivery.
- Shipment confirmationsTier 2 · medium · 4dpartner-facingno owner
Partner-facing: delivery is gated by the other side's re-certification calendar, not by your team.
Start this in week one regardless of the plan
Partner-facing interfaces are gated by someone else's calendar. Re-certification with a trading partner runs in months and cannot be compressed by adding people to your side. Open those conversations in wave 1 even though the build lands later.
The sequencing rules, stated
- · Capacity 56 person-days per wave — 4 people × 4 weeks × 5 days at 70% productive time.
- · Wave 1 deliberately excludes Tier 1 and partner-facing work. Piloting on critical traffic is how a migration loses its sponsor in month two.
- · Tier 1 and complex work is scheduled early, not late. Contingency is a thing you spend, and there is none left at the end.
- · 3 partner-facing interface(s). Open the re-certification conversation in wave 1 regardless of when they are built — partner calendars run in months and are not yours to compress.
Elapsed time assumes waves run back to back, which is optimistic — real programmes lose weeks between them to testing, approvals and freeze periods. The capacity model assumes 70% productive time; if your team also runs production support, it is lower than that. Nothing is transmitted or stored.
Other tools
- EDI viewer & validator (X12 + EDIFACT)
- X.509 certificate decoder
- JSON ↔ XML converter
- CSV ↔ JSON converter
- OpenAPI linter
- MCP tool-definition linter
- OpenAPI → agent tools
- Agent blast-radius calculator
- Prompt secret scanner
- Agent cost & context calculator
- Agent-readiness scorecard
- iPaaS readiness assessment
- Modernisation roadmap generator
- Migration risk register
- Cutover runbook builder
- Interface catalogue builder
- Function Point estimator
- Platform migration assessor
- Fixed-width flat file parser
- webMethods flow reader
- SAP IDoc viewer
- SWIFT MT & ISO 20022 viewer
- HL7 v2 message viewer
- XSLT tester
- XPath tester
- CI/CD workflow security linter
- Regex tester & ReDoS checker
- Webhook signature verifier
- SLA & error budget calculator
- Retry & backoff simulator
- JSONPath tester
- JSON Schema generator
- Encoding & mojibake fixer
- JSON formatter & validator
- JSON diff
- Epoch & timestamp converter
- Base64 encoder & decoder
- UUID & ULID generator
- JWT decoder
- Cron expression explainer
- Interface math calculator
- Post-quantum migration matrix
- Post-quantum exposure calculator
These exist because the underlying problem is real. If the numbers you just put in look uncomfortable, that is usually worth a conversation.